Bench marks for irrigation water efficiency in Neyyar irrigation project
Project Type:
CWRDM Plan Funded
Degradation of coastal wetland habitats - a study with special emphasis on ecology and conservation of Smooth-coated otter (Lutra perspicillata),
Project Type:
CWRDM Plan Funded
Stable isotope based assessment of food web structure and carbon sources delineation in a tropical river ecosystem
Project Type:
CWRDM Plan Funded
Efficacy of Managed Aquifer Recharge (MAR) practices in the Iruvanhippuzha watershed of Chaliyar River Basin
Project Type:
CWRDM Plan Funded
Spatiotemporal dynamics of microplastics in the Chaliyar River Basin, Kerala (MICHARB)
Project Type:
CWRDM Plan Funded
Development and Demonstration of Nanotechnology Enabled Decentralized Wastewater Treatment via Constructed Wetlands; an Integrated Performance Model for Trivandrum Urban
Self-sustainable wastewater treatment for houses/gated communities using microbial fuel cell (MFC): An innovative solution for treatment and resource recovery.
Impact assessment of Soil and Water Conservation Measures on Hydrological Processes and Sediment Yield under changing Climatic Conditions of selected watersheds in Malappuram District
Impact assessment of Soil and Water Conservation Measures on Hydrological Processes and Sediment Yield under changing Climatic Conditions of selected watersheds in Malappuram District
Microclimatic assessment of the water vapour flux in an urban ecosystem for identifying better climate change mitigation measures and scope for atmospheric water harvesting
Downscaling future precipitation and temperature of selected regions in Kerala using Statistical Downscaling Model (SDSM)
Project Type:
CWRDM Plan Funded
Date of Completion:
Duration:
3 Years
Control of multiple drug resistant water borne bacterial pathogen (Escherichia coli, Salmonella typhi and Vibrio cholera) from the drinking water system by using bacteriophages cocktail in herbal formulation(Neem Extract).
Project Type:
CWRDM Plan Funded
Date of Completion:
Modelling of dam-break scenarios of the dams built in 1950’s. A case study of Mattupetty Dam