Jainet P J
Designation
Scientist (on working arrangement at EVP office, KSCSTE)
Research Group
Hydrology and Climatology
  • Jainet P J

    Jainet P J
    Designation
    Scientist (on working arrangement at EVP office, KSCSTE)
    Research Group
    Hydrology and Climatology
  • EDUCATIONAL PROFILE

    • M.Tech.: 2009; Hydrology, IIT Roorkee
    • B.Tech.: 2007; Civil Engineering, University of Calicut

    CAREER DETAILS

    • 2018 - Present : Scientist, CWRDM
    • 2015 - 2018       : Scientist-B, CWRDM

    MEMBERSHIPS

    • Member International Association of Hydrological Sciences, UK
    • Member International Water Association  
    • Life Member Indian Association of Hydrologists

    RESEARCH INTERESTS

    • Hydrological modelling
    • Flood Risk Assessment 
    • Hydrology   River Rejuvenation
    • Lakes and Ecosystem Services
    • Forest Hydrology

Baseline data collection and modelling rejuvenation scenarios of Pulamonthodu, Kottarakkara
Principal Investigator:
Co Principal Investigator/s:
Non-CWRDM Co-Principal Employee:
Dr. Dipu S, Dr. C P Priju
Project Type:
CWRDM Plan Funded
Duration:
2 Years
Integrated Management of Surface Water and Groundwater in the Changing Climatic Scenario to Mitigate Water Scarcity in Valapattanam River Basin  years, Budget (Rs. 19,72,000/-.), Investigators: Dr. Sharannya T M., D

Integrated Management of Surface Water and Groundwater in the Changing Climatic Scenario to Mitigate Water Scarcity in Valapattanam River Basin 

Principal Investigator:
Co Principal Investigator/s:
Project Type:
CWRDM Plan Funded
Duration:
3 Years
Budget:
19,72,000/-
Centre of Excellence for Water related Disaster Management in Kerala
Principal Investigator:
Co Principal Investigator/s:
Funding Agency:
KSCSTE
Project Type:
Externally Funded
Duration:
2 Years
Impact of Climate Change on Hydrology of Rivers Upstream of Thanneermukkom Barrage
Co Principal Investigator/s:
Project Type:
CWRDM Plan Funded
Duration:
3 Years (June 2020 – May 2023)
Investigation on Ecosystem services of small lakes in Agro-Ecological zones of Western Ghats and the influence of regional factors.
Principal Investigator:
Co Principal Investigator/s:
Project Type:
CWRDM Plan Funded
Duration:
3Years
Budget:
25,99,000 /-
Early Adopter programme of SWOT mission by NASA, Centre National D'Etudes Spatiales (CNES), United Kingdom Space Agency and Canadian Space Agency : Leveraging Citizen Science for the estimation of Lake Volumes using SWOT

The project featured in NASA website:
https://swot.jpl.nasa.gov/applications/early-adopters/

Project site appearing on LOCSS website
https://www.locss.org/gauge/pookode-lake

Principal Investigator:
Co Principal Investigator/s:
Funding Agency:
NASA/University of Washington
Project Type:
Externally Funded
Duration:
2021-2023
Evaluation of discharge data of Pambar basin at Kovikadavu
Principal Investigator:
Funding Agency:
KSEB
Project Type:
Externally Funded
Date of Completion:
Duration:
2 Years
Modelling of dam-break scenarios of the dams built in 1950’s. A case study of Mattupetty Dam
Principal Investigator:
Project Type:
CWRDM Plan Funded
Date of Completion:
Duration:
3 years
Budget:
Rs. 28.97 lakhs
Application of an Integrated Surface Water – Ground Water Model in the Valapatanam River Basin.

Application of an Integrated Surface Water – Ground Water Model in the Valapatanam River Basin.

Principal Investigator:
Co Principal Investigator/s:
Non-CWRDM Co-Principal Employee:
Dawn Emil SebastianDawn Emil Sebastian
Funding Agency:
(SEED money program, KSCSTE-CWRDM
Date of Completion:
Budget:
500000
Feasibility report of waterbody development at Paropadi, Kozhikode

Feasibility report of waterbody development at Paropadi, Kozhikode

Non-CWRDM Co-Principal Employee:
Harikumar P S, Madhavchandra, Sushanth C M
Date of Completion:
Duration:
3 Months
Budget:
5 Lakhs
Baseline studies of estimation of Water Use Efficiency of 5 Irrigation Projects in Kerala

Baseline studies of estimation of Water Use Efficiency of 5 Irrigation Projects in Kerala

Principal Investigator:
Co Principal Investigator/s:
Non-CWRDM Co-Principal Employee:
Dr. A B Anitha
Funding Agency:
NWM, MoWR
Project Type:
Externally Funded
Date of Completion:
Budget:
Rs 47.08 Lakhs
Environmental Status of Selected Rivers of Kerala
Principal Investigator:
Co Principal Investigator/s:
Project Type:
CWRDM Plan Funded
Date of Completion:
Duration:
2020 - 2023
Assessment of impacts due to re locating the bund at Kozhichira to the upstream of proposed jetty of water metro at Kakkanad
Funding Agency:
KMRL
Project Type:
Externally Funded
Date of Completion:
Duration:
1 Year
Investigations on the Environmental Quality Deterioration of Pookode Lake in Wayanad District
Co Principal Investigator/s:
Funding Agency:
DTPC Wayanad
Project Type:
Externally Funded
Date of Completion:
Duration:
1 Year
Feasibility Study for Identifying Surface Water Source for Kerala Minerals and Metals Ltd, Kollam
Co Principal Investigator/s:
Funding Agency:
KMML, Kollam
Project Type:
Externally Funded
Date of Completion:
Duration:
1 Year
Technical feasibility of water body development at Paroppadi, Kozhikode
Funding Agency:
Tourism Department
Project Type:
Externally Funded
Date of Completion:
Duration:
6 Months
A study on the allowable pollution loads in Pamba river using Water Quality Models.
Principal Investigator:
Co Principal Investigator/s:
Project Type:
CWRDM Plan Funded
Date of Completion:
Duration:
2.5 Years

No publications exists in this category

Jainet P J and Vivek B, (2020). Integrated Hydrological Model for Pookode Lake, Wayanad using MIKE-SHE. Proceedings of the IIIrd Indian National Groundwater Conference (INGWC 2020), February 18-20, 2020, CWRDM, Kozhikode, Kerala, India. pp 203.

Management Action Plan for Rejuvenation of Pulamonthodu in Kottarakkara, Kollam District
Publication Year:
2017
First Author:
Co Author:

No publications exists in this category

No publications exists in this category

No publications exists in this category