Jainet P J
Designation
Scientist (on working arrangement at EVP office, KSCSTE)
Research Group
Hydrology and Climatology
  • Jainet P J

    Jainet P J
    Designation
    Scientist (on working arrangement at EVP office, KSCSTE)
    Research Group
    Hydrology and Climatology
  • EDUCATIONAL PROFILE

    • M.Tech.: 2009; Hydrology, IIT Roorkee
    • B.Tech.: 2007; Civil Engineering, University of Calicut

    CAREER DETAILS

    • 2018 - Present : Scientist, CWRDM
    • 2015 - 2018       : Scientist-B, CWRDM

    MEMBERSHIPS

    • Member International Association of Hydrological Sciences, UK
    • Member International Water Association  
    • Life Member Indian Association of Hydrologists

    RESEARCH INTERESTS

    • Hydrological modelling
    • Flood Risk Assessment 
    • Hydrology   River Rejuvenation
    • Lakes and Ecosystem Services
    • Forest Hydrology

Baseline data collection and modelling rejuvenation scenarios of Pulamonthodu, Kottarakkara
Principal Investigator:
Co Principal Investigator/s:
Non-CWRDM Co-Principal Employee:
Dr. Dipu S, Dr. C P Priju
Project Type:
CWRDM Plan Funded
Duration:
2 Years
Integrated Management of Surface Water and Groundwater in the Changing Climatic Scenario to Mitigate Water Scarcity in Valapattanam River Basin

Integrated Management of Surface Water and Groundwater in the Changing Climatic Scenario to Mitigate Water Scarcity in Valapattanam River Basin 

Principal Investigator:
Co Principal Investigator/s:
Project Type:
CWRDM Plan Funded
Duration:
3 Years
Centre of Excellence for Water related Disaster Management in Kerala
Principal Investigator:
Co Principal Investigator/s:
Funding Agency:
KSCSTE
Project Type:
Externally Funded
Duration:
2 Years
Impact of Climate Change on Hydrology of Rivers Upstream of Thanneermukkom Barrage
Co Principal Investigator/s:
Project Type:
CWRDM Plan Funded
Duration:
3 Years (June 2020 – May 2023)
Investigation on Ecosystem services of small lakes in Agro-Ecological zones of Western Ghats and the influence of regional factors.
Principal Investigator:
Co Principal Investigator/s:
Project Type:
CWRDM Plan Funded
Duration:
3Years
Early Adopter programme of SWOT mission by NASA, Centre National D'Etudes Spatiales (CNES), United Kingdom Space Agency and Canadian Space Agency : Leveraging Citizen Science for the estimation of Lake Volumes using SWOT

The project featured in NASA website:
https://swot.jpl.nasa.gov/applications/early-adopters/

Project site appearing on LOCSS website
https://www.locss.org/gauge/pookode-lake

Principal Investigator:
Co Principal Investigator/s:
Funding Agency:
NASA/University of Washington
Project Type:
Externally Funded
Duration:
2021-2023
Evaluation of discharge data of Pambar basin at Kovikadavu
Principal Investigator:
Funding Agency:
KSEB
Project Type:
Externally Funded
Date of Completion:
Duration:
2 Years
Modelling of dam-break scenarios of the dams built in 1950’s. A case study of Mattupetty Dam
Principal Investigator:
Project Type:
CWRDM Plan Funded
Date of Completion:
Duration:
3 years
Application of an Integrated Surface Water – Ground Water Model in the Valapatanam River Basin.

Application of an Integrated Surface Water – Ground Water Model in the Valapatanam River Basin.

Principal Investigator:
Co Principal Investigator/s:
Non-CWRDM Co-Principal Employee:
Dawn Emil SebastianDawn Emil Sebastian
Funding Agency:
(SEED money program, KSCSTE-CWRDM
Date of Completion:
Feasibility report of waterbody development at Paropadi, Kozhikode

Feasibility report of waterbody development at Paropadi, Kozhikode

Non-CWRDM Co-Principal Employee:
Harikumar P S, Madhavchandra, Sushanth C M
Date of Completion:
Duration:
3 Months
Baseline studies of estimation of Water Use Efficiency of 5 Irrigation Projects in Kerala

Baseline studies of estimation of Water Use Efficiency of 5 Irrigation Projects in Kerala

Principal Investigator:
Co Principal Investigator/s:
Non-CWRDM Co-Principal Employee:
Dr. A B Anitha
Funding Agency:
NWM, MoWR
Project Type:
Externally Funded
Date of Completion:
Environmental Status of Selected Rivers of Kerala
Principal Investigator:
Co Principal Investigator/s:
Project Type:
CWRDM Plan Funded
Date of Completion:
Duration:
2020 - 2023
Assessment of impacts due to re locating the bund at Kozhichira to the upstream of proposed jetty of water metro at Kakkanad
Funding Agency:
KMRL
Project Type:
Externally Funded
Date of Completion:
Duration:
1 Year
Investigations on the Environmental Quality Deterioration of Pookode Lake in Wayanad District
Co Principal Investigator/s:
Funding Agency:
DTPC Wayanad
Project Type:
Externally Funded
Date of Completion:
Duration:
1 Year
Feasibility Study for Identifying Surface Water Source for Kerala Minerals and Metals Ltd, Kollam
Co Principal Investigator/s:
Funding Agency:
KMML, Kollam
Project Type:
Externally Funded
Date of Completion:
Duration:
1 Year
Technical feasibility of water body development at Paroppadi, Kozhikode
Funding Agency:
Tourism Department
Project Type:
Externally Funded
Date of Completion:
Duration:
6 Months
A study on the allowable pollution loads in Pamba river using Water Quality Models.
Principal Investigator:
Co Principal Investigator/s:
Project Type:
CWRDM Plan Funded
Date of Completion:
Duration:
2.5 Years

No publications exists in this category

Jainet P J and Vivek B, (2020). Integrated Hydrological Model for Pookode Lake, Wayanad using MIKE-SHE. Proceedings of the IIIrd Indian National Groundwater Conference (INGWC 2020), February 18-20, 2020, CWRDM, Kozhikode, Kerala, India. pp 203.

Management Action Plan for Rejuvenation of Pulamonthodu in Kottarakkara, Kollam District
Publication Year:
2017
First Author:
Co Author:

No publications exists in this category

No publications exists in this category

No publications exists in this category