Prajith V
Designation
Scientist B (on Study leave)
Research Group
Hydrology and Climatology
  • EDUCATIONAL PROFILE

    • M-Tech; 2016 ; Water resources and Hydro-Informatics, Government Engineering College, Thrissur, Kerala, India 
      Thesis: “Impact of artificial recharging structures on ground water table-A case study in Manjeshwar watershed” 
    • B-Tech; 2014; Department of Civil Engineering, Al-Ameen Engineering College, Kerala, India 
      Thesis: “Estimation of sediment yield in Peechi reservoir using IBS”

    CAREER DETAILS

    • 2019- Present Scientist B, CWRDM
    • 2016-2019-Assistant professor in MEA Engineering College, Perinthalmanna
       

    RESEARCH INTERESTS

    • Surface Flow Modeling 
    • Ground Water flow Modeling 
    • Forest Hydrology 
    • Rain water harvesting

Feasibility Study on Alternate Water Sources for the Infopark Kochi Campus
Co Principal Investigator/s:
Funding Agency:
INFOPARK
Duration:
2 years
Preparation of an Integrated River Basin Management Plan for Bhavalipuzha for its Sustainable Development and Management
Principal Investigator:
Co Principal Investigator/s:
Funding Agency:
Haritha Keralam Mission
Duration:
1 year
Assessment of Water Availability for the NHAI-ULCCS Project for Six Laning of NH- 17 section from Thalapady to Chengala in Kasaragod District
Co Principal Investigator/s:
Funding Agency:
ULCCS, Kozhikode
Duration:
6 Months
Scientific and Technical Validation of Bhujal App for Water Level Monitoring in Borewells
Co Principal Investigator/s:
Duration:
3 Months
Rainwater harvesting and groundwater recharge in the Cochin special economic zone campus, Kakkanad
Co Principal Investigator/s:
Funding Agency:
Cochin special economic zone campus, Kakkanad
Duration:
8 Months
Investigations of surface water Groundwater interactions of a perennial freshwater lake
Principal Investigator:
Co Principal Investigator/s:
Project Type:
CWRDM Plan Funded
Duration:
3 years
A study on the assimilative capacity of Parvathy Puthanar and the scope of Bioremediation for pollution abatement
Principal Investigator:
Co Principal Investigator/s:
Project Type:
CWRDM Plan Funded
Duration:
3 years
Study on the rainwater harvesting at calicut university
Principal Investigator:
Co Principal Investigator/s:
Funding Agency:
University of Calicut
Date of Completion:
Duration:
6 months
Hydrological responses of forested and deforested catchments a case study
Principal Investigator:
Co Principal Investigator/s:
Project Type:
CWRDM Plan Funded
Date of Completion:
Duration:
3 years
Preparation of water management plan for Tuticorin Airport
Co Principal Investigator/s:
Funding Agency:
Airport Authority of India
Date of Completion:
Duration:
2020-2021
Irrigation Management plan for Nochad Gramma Panchayath
Co Principal Investigator/s:
Funding Agency:
ULCCS
Date of Completion:
Duration:
2 years
Study on Preparation of a Comprehensive Water Resource Development Plan for the International Research Institute of Ayurveda, Kannur
Co Principal Investigator/s:
Funding Agency:
KITCO
Date of Completion:
Duration:
1 year
Feasibility study on sand mining in the selected rivers of Kozhikode district
Co Principal Investigator/s:
Funding Agency:
District administration, Kozhikode
Date of Completion:
Duration:
3 Months
Integrated River basin Management Plan for Bhavalipuzha Haritha Kerala Mission
Principal Investigator:
Co Principal Investigator/s:
Funding Agency:
Govt. of Kerala
Date of Completion:
Feasibility of sand mining of selected rivers in Kozhikode District
Co Principal Investigator/s:
Funding Agency:
LSGD
Date of Completion:
Duration:
4 Months
Rainwater Harvesting and Groundwater Recharge in and around Synthite Industries Campus, Kolenchery- Ernakulam District
Co Principal Investigator/s:
Date of Completion:
Duration:
6 Months
Studies on mining of river sand from the local bodies of northern Kerala
Co Principal Investigator/s:
Funding Agency:
Local Bodies of Kerala
Date of Completion:
Demonstration of measures to enhance the efficiency and utility of existing water conservation structures and other natural sources for better water harvesting
Co Principal Investigator/s:
Funding Agency:
UNDP
Project Type:
Externally Funded
Date of Completion:
Duration:
2 years
Hydrological Investigations in the High Range Mountain Landscape, Kerala
Co Principal Investigator/s:
Funding Agency:
UNDP, India
Project Type:
Externally Funded
Date of Completion:
Duration:
2 years
Assessment of impacts due to re locating the bund at Kozhichira to the upstream of proposed jetty of water metro at Kakkanad
Funding Agency:
KMRL
Project Type:
Externally Funded
Date of Completion:
Duration:
1 Year
Hydrological investigations in the high range mountain land scape of Munnar
Co Principal Investigator/s:
Funding Agency:
UNDP
Project Type:
Externally Funded
Date of Completion:
Duration:
2.5 years

No publications exists in this category

No publications exists in this category

No publications exists in this category

No publications exists in this category

No publications exists in this category