Vivek B
Designation
Senior Scientist & Head i/c
Research Group
Ecology and Environment
Office No
0495-2351 841
  • Vivek B

    Vivek B
    Designation
    Senior Scientist & Head i/c
    Research Group
    Ecology and Environment
    Office No
    0495-2351 841
  • EDUCATIONAL PROFILE

    • M.Tech. - Environmental Engineering (2008), Department of Civil Engineering, Government Engineering College, Thrissur, University of Calicut.
    • B.Tech.- Civil Engineering (2004), Department of Civil Engineering, MA College of Engineering, Kothamangalam, Mahatma Gandhi University, Kottayam.

    CAREER DETAILS

    • 2018 - Present : Scientist
    • 2015 - 2018      : Scientist-B

    MEMBERSHIPS

    • Member International Water Association (1608141)
    • Life Member Institution of Engineers India (MIE-1534224)
    • Life Member Indian Association of Hydrologists (LM-1893)
    • Life Member the Indian Society for Hydraulics (LM-1297)
    • Life Member Indian Water Resources Society (LM-17-7704)

    RESEARCH INTERESTS

    • Water and Wastewater treatment
    • Water Quality Models
    • Pollution management
    • Lakes and Ecosystem Services
    • EIA

Community-based Participatory water harvesting for irrigation in SC Communities in the Coastal District of Kerala, Kozhikode

Community-based Participatory water harvesting for irrigation in SC Communities in the Coastal District of Kerala, Kozhikode

Principal Investigator:
Funding Agency:
ICAR-CCARI
Project Type:
Externally Funded
Duration:
2 years
Budget:
Rs. 3 Lakhs
Study of Carbon footprint in agricultural land use system from the temperate and tropical ecosystem Western Ghats under Climate Change scenario
Principal Investigator:
Co Principal Investigator/s:
Funding Agency:
SERB- DST
Project Type:
Externally Funded
Duration:
3 Years
Climate change scenario analysis and evolving adaptation strategies to manage soil and water resources
Principal Investigator:
Co Principal Investigator/s:
Funding Agency:
District Soil Conservation Department, Kozhikode
Project Type:
Externally Funded
Duration:
2 years
Preparation of an Integrated River Basin Management Plan for Bhavalipuzha for its Sustainable Development and Management
Principal Investigator:
Co Principal Investigator/s:
Funding Agency:
Haritha Keralam Mission
Duration:
1 year
Investigation on Ecosystem services of small lakes in Agro-Ecological zones of Western Ghats and the influence of regional factors.
Principal Investigator:
Co Principal Investigator/s:
Project Type:
CWRDM Plan Funded
Duration:
3Years
Early Adopter programme of SWOT mission by NASA, Centre National D'Etudes Spatiales (CNES), United Kingdom Space Agency and Canadian Space Agency : Leveraging Citizen Science for the estimation of Lake Volumes using SWOT

The project featured in NASA website:
https://swot.jpl.nasa.gov/applications/early-adopters/

Project site appearing on LOCSS website
https://www.locss.org/gauge/pookode-lake

Principal Investigator:
Co Principal Investigator/s:
Funding Agency:
NASA/University of Washington
Project Type:
Externally Funded
Duration:
2021-2023
Preparation of an Integrated River Basin Management Plan for Bavalipuzha for its Sustainable Development and Management
Principal Investigator:
Funding Agency:
Haritha Keralam Mission
Project Type:
Externally Funded
Duration:
9 Months
Transformation to self Sustained Tribal Community Developing Technological Solutions for ensuring Water Quality, Quantity and Agro Value Addition
Principal Investigator:
Funding Agency:
Department of science and Technology, Govt. of India
Project Type:
Externally Funded
Date of Completion:
Duration:
3 Years
Budget:
Rs. 57,36,464/-
Preparation of Bharathapuzha River Rejuvenation Action Plan 2025
Principal Investigator:
Funding Agency:
Friends of Bharathapuzha Nhangattiri, Pattambi
Budget:
Rs. 5,99,676
Feasibility study on water resources management in Kannur University campuses
Principal Investigator:
Co Principal Investigator/s:
Funding Agency:
Kannur University
Duration:
9 months (Sept 2020-May 2021)
Feasibility Study on Alternate Water Sources for the Infopark Kochi Campus
Co Principal Investigator/s:
Funding Agency:
INFOPARK
Duration:
2 years
A study on the assimilative capacity of Parvathy Puthanar and the scope of Bioremediation for pollution abatement
Principal Investigator:
Co Principal Investigator/s:
Project Type:
CWRDM Plan Funded
Duration:
3 years
Integrated River basin Management Plan for Bhavalipuzha Haritha Kerala Mission
Principal Investigator:
Co Principal Investigator/s:
Funding Agency:
Govt. of Kerala
Date of Completion:
Feasibility study on rainwater harvesting in Malabar Medical College, Modakkallur, Atholi
Principal Investigator:
Funding Agency:
Malabar Medical College, Modakkallur
Date of Completion:
Duration:
6 Months
Preparation of an Integrated Water Resource Development Plan for Thodupuzha Cricket Stadium of KCA
Principal Investigator:
Funding Agency:
Kerala Cricket Association
Date of Completion:
Duration:
3 months
Environmental Status of Selected Rivers of Kerala
Principal Investigator:
Co Principal Investigator/s:
Project Type:
CWRDM Plan Funded
Date of Completion:
Duration:
2020 - 2023
PCR in water quality analysis –A molecular approach to identify Waterborne pathogens in drinking water sources
Principal Investigator:
Project Type:
CWRDM Plan Funded
Date of Completion:
Preparation of Management Action Plan to Control Pollution of Kallai River for the sustainability of the riverine system
Principal Investigator:
Project Type:
CWRDM Plan Funded
Date of Completion:
Duration:
2.5 Years
A study on the allowable pollution loads in Pamba river using Water Quality Models.
Principal Investigator:
Co Principal Investigator/s:
Project Type:
CWRDM Plan Funded
Date of Completion:
Duration:
2.5 Years
Feasibility report of waterbody development at Paropadi, Kozhikode

Feasibility report of waterbody development at Paropadi, Kozhikode

Non-CWRDM Co-Principal Employee:
Harikumar P S, Madhavchandra, Sushanth C M
Date of Completion:
Duration:
3 Months
Preparation of water management plan for Tuticorin Airport
Co Principal Investigator/s:
Funding Agency:
Airport Authority of India
Date of Completion:
Duration:
2020-2021
Rainwater Harvesting in Government Engineering College Sreekrishnapuram, Palakkad
Co Principal Investigator/s:
Funding Agency:
Government Engineering College, Palakkad
Date of Completion:
Duration:
3 months
Feasibility of sand mining of selected rivers in Kozhikode District
Co Principal Investigator/s:
Funding Agency:
LSGD
Date of Completion:
Duration:
4 Months
Water management plan for Calicut International Airport
Co Principal Investigator/s:
Funding Agency:
Airport Authority of India
Date of Completion:
Duration:
9 Months
Feasibility study on water Resources Development and Management at the Sree Sankaracharya University of Sanskrit, Kalady
Co Principal Investigator/s:
Funding Agency:
SSSU
Date of Completion:
Preparation of a Management Action Plan for the Rejuvenation of Manjalithodu in Angamali
Co Principal Investigator/s:
Funding Agency:
Directorate of Environment & Climate Change, Govt. of Kerala
Date of Completion:
Flood Investigation for the preparation of Flood Mitigation plan for Punoorpuzha, Kozhikode
Principal Investigator:
Co Principal Investigator/s:
Funding Agency:
IDRB, Govt. of Kerala
Date of Completion:
Duration:
6-months (2021)
Feasibility Study on Alternate Water Sources for the Infopark Kochi Campus
Co Principal Investigator/s:
Funding Agency:
Infopark
Date of Completion:
Duration:
6 Months
Assessment of impacts due to re locating the bund at Kozhichira to the upstream of proposed jetty of water metro at Kakkanad
Funding Agency:
KMRL
Project Type:
Externally Funded
Date of Completion:
Duration:
1 Year
Investigations on the Environmental Quality Deterioration of Pookode Lake in Wayanad District
Co Principal Investigator/s:
Funding Agency:
DTPC Wayanad
Project Type:
Externally Funded
Date of Completion:
Duration:
1 Year
Feasibility Study for Identifying Surface Water Source for Kerala Minerals and Metals Ltd, Kollam
Co Principal Investigator/s:
Funding Agency:
KMML, Kollam
Project Type:
Externally Funded
Date of Completion:
Duration:
1 Year
Technical feasibility of water body development at Paroppadi, Kozhikode
Funding Agency:
Tourism Department
Project Type:
Externally Funded
Date of Completion:
Duration:
6 Months

No publications exists in this category

Jainet P J and Vivek B, (2020). Integrated Hydrological Model for Pookode Lake, Wayanad using MIKE-SHE. Proceedings of the IIIrd Indian National Groundwater Conference (INGWC 2020), February 18-20, 2020, CWRDM, Kozhikode, Kerala, India. pp 203.
Vivek B, Jayakumar P, “Wastewater treatment technologies to combat pollution” Proceedings of “Envirotech-2018” .Organised by OISCA Global Youth forum, , at XIME, Kalamassery during 9-10 February 2018.
Aravind V P, Vivek B, Vinay M, Magesh N S, Smitha V S (2026). Technology alongside tradition – Integrating indigenous knowledge and technology for wash improvements. Proceedings of the National Symposium on Innovations in Water and Wastewater Treatment

No publications exists in this category

No publications exists in this category

No publications exists in this category